Power Outages Are Getting Worse.
The Cost Is Staggering.
An aging electric grid + intensifying storms = a crisis most businesses and homes aren't prepared for.
$26,000
Avg Revenue Loss
Per 4-hour outage for an average SMB
550,000+
People Lost Power 4+ Days
Hurricane Fiona, 2022
71%
No Formal Backup Plan to protect their business
10 Million
People Affected
2003 US - Canada Blackout
We Can Help!
What our customers are saying

"DC Power really helped me understand my power requirements. As a result, our DR plan is complete and ready if we ever need it."
CBCP Professional

"The process was so easy! Great working with such professionals!"
Facility Manager

"The people at DC Power understood exactly what I was trying to do and they gave me a product that my facility folks and my insurance folks believe in".
Operations Director
Site Survey — At a Glance
Ensure your facility is ready for any outage with a comprehensive Canadian Site Survey. Our assessment captures everything needed to design, size, and install a fully compliant emergency generator system.
-
What the Survey Covers
-
Full review of your facility’s electrical service, distribution panels, and transfer‑switch requirements.
-
Detailed evaluation of generator placement, clearances, exhaust routing, and concrete pad specifications.
-
Load analysis identifying critical, high‑priority, and essential systems to determine proper generator sizing.
-
Environmental and regulatory checks, including TSSA fuel rules, noise bylaws, emissions standards, and ESA requirements.
-
Coordination needs with utilities, contractors, and building management to ensure a smooth installation.
-
Key Outcomes
-
Recommended generator size.
-
Clear specifications for fuel storage, ventilation, exhaust, and electrical connections.
-
Optional upgrades such as extended‑run tanks, remote monitoring, sound attenuation, and cold‑weather packages.
-
A complete requirements checklist covering permits, inspections, training, and commissioning.
-
Why It Matters
A Site Survey ensures your generator system is engineered correctly, installed safely, and fully compliant with CSA, NFPA, TSSA, ESA, and municipal standards. It eliminates guesswork, reduces installation delays, and guarantees reliable backup power when your facility needs it most.
-
What to do Next
Fill out the Emergency Generator Assessment Form below.
Complete payment with our convenient check out process.
In 48 hours you will receive your Emergency Generator Power Report to include with your Business Continuity Plan.